Free shipping on tanks and on orders over $500 Across Canada since 2015 · 1-877-306-2146

Projects / Commercial

King Animal Hospital – Well Water Treatment Plant

At King Animal Hospital in King City, Ontario, two low-producing wells gave only 20 and 14 gallons per minute for a building that needs 60. A Sanitas well water treatment plant closes the gap.

King Animal Hospital Well Water treatment Plant - cover -past commercial projects around Canada

The project

The Sanitas plant pumps from both wells on the property and alternates between them by runtime to share the load.

A three-stage treatment deals with what is in this well water: carbon filtration for colour and taste, Birm media to remove iron, and an ion-exchange softener for hardness.

The system

Treated water is held in storage tanks inside the building, so supply does not depend on what the wells can give at any moment.

When water is called for, duplex booster pumps start automatically and send it through a dual UV system certified to NSF 55.

Benefits

The building gets a steady, reliable supply from wells that could not meet its demand directly.

Carbon filtration, iron removal, softening and UV disinfection make the water safe and pleasant to use. The same approach suits other properties with low-yield wells.

Planning a building?

Tell us what the water will be used for and how much roof there is. Cleanflo will say what a system would involve.

Talk to Cleanflo at cfwt.ca